Evansville Regional Airport / Major Runway Reconstruction & Extension

Power producer Electric Energy Inc. constructed a new CCB landfill for scrubber waste in Joppa, IL. WB•Koester began work early May to construct two creek crossings and haul roads to access the soil stockpile.

  • Cut, Stockpiled, & Placed 465,000 CY of soil

  • Placed 72,000 CY of 3 foot clay liner

  • Installed 58,000 SY of 60 mm HDPE liner

  • Placed 37,000 tons of sand drainage layer

  • Installed 29,500 SY of 40 mm HDPE

  • Provided permanent erosion control and seeding for 30 acres lot